We were commissioned to carry out a full emergency lighting survey and upgrade across a 12-unit retail complex in Newcastle. The existing system was ageing, with multiple non-maintained fittings that had fallen out of compliance with current BS 5266 requirements. The client needed a complete solution ahead of an upcoming local authority inspection.

Scope of Works

Our engineers carried out an initial audit of all existing emergency fittings and escape route signage across the complex. A full replacement programme was designed and carried out with minimal disruption to trading hours, with the majority of work completed outside of retail opening times.

Key Deliverables

  • Emergency lighting audit and compliance report across all 12 units
  • Replacement of all legacy fittings with LED maintained emergency luminaires
  • Installation of illuminated exit and directional signage throughout
  • Central battery monitoring system with addressable test function
  • Compliance with BS 5266-1 and BS EN 1838
  • Full test and commissioning records with 3-year service schedule

Outcome

The complex passed its local authority inspection with no remedial actions required. The new LED fittings are expected to reduce energy consumption by over 60% compared to the legacy system, with a projected payback period of under three years.